HTML Block |
|
---|---|
HTML Block |
|
Job Name: | Centeris Data center |
Foreman: | Danny patterson |
Job Address: | 1023 39th Ave se Puyallup Puyallup Wa United States Map It |
Inspected By: | Jen moreau |
Date | 04/30/2024 |
Employees on Site: | Dan Patterson, Dylan utly |
HTML Block | |
HTML Block |
|
Are employees wearing job and task appropriate PPE? | Yes |
Are employees wearing hearing protection in areas where noise levels exceed 85db? | Yes |
Are employees wearing respiratory protection in accordance with the manufacturers SDS? | N/A |
HTML Block |
|
Are employees wearing appropriate fall protection where a fall hazard exceeds 4' or more? | Yes |
Are Fall Protection Work Plans being completed for all fall hazards 10' and above? | Yes |
Are fall protection devices and equipment in serviceable condition? | Yes |
Are fall protection devices and equipment being used correctly? | Yes |
HTML Block |
|
Are ladders in serviceable condition, and are the inspections documented on the Ladder Inspection Checklist? | N/A |
Are extension ladders secured at the top and bottom, extending at least 36" above the landing point and set to a proper pitch of 4:1? | N/A |
Are ladders being used correctly? | N/A |
Have Scaffold components been inspected for visible defects by a competent person prior to use? | N/A |
HTML Block |
|
Has the MEWP been inspected, and has the inspection been documented on the MEWP Pre Use Checklist? | Yes |
File | |
Are the MEWPS being used appropriately? | Yes |
Are employees using fall protection inside the MEWPS when required? | N/A |
Are operators and occupants trained and authorized to use the MEWP? | Yes |
HTML Block |
|
Are there clear and safe routes for ingress and egress to and from work areas? | Yes |
Are floor holes/penetrations protected, marked and secured? | N/A |
Are work areas clean and orderly? | Yes |
Is material stored or positioned to prevent tipping or falling? | Yes |
Have extension cords been inspected for visible defects and wear? | Yes |
HTML Block |
|
Does the job box contain the following inspected and fully stocked items: BBP kit, First Aid Kit and 2 eve wash bottles? | Yes |
File | |
Is the evacuation plan and rally point displayed and understood by all employees? | Yes |
Are Emergency numbers posted? | No |
Is there a jobsite First Aid Station? | Yes |
File | |
Where is the nearest Hospital/Urgent Care facility? | Good Sam hospital |
Does the job have an onsite medic? | No |
HTML Block |
|
List all HBI employees who are certified in First Aid and CPR: |
|
Comments: | Could not find the job board or jobs first aid kit. However We have them in the gang box |
HTML Block |
|
Have all employees read and signed the Site-Specific Safety Plan? | Yes |
File | |
Are Pre-Task Plans (PTP) being done daily? | Yes |
Are Toolbox Talks/Safety Meetings being conducted weekly? | Yes |
Have all employees been orientated to the jobsite? | Yes |
HTML Block |
|
Is there sufficient lighting on the job, and proper task lighting being used in work areas where necessary? | Yes |
Are portable fire extinguishers in accessible locations and in serviceable condition? | Yes |
File | |
Are the bathroom facilities, and hand washing stations operable and sanitary? | Yes |
Are all employees participating in stretch and flex daily? | Yes |
HTML Block |
|
Comments/Corrective Action Taken: | Spoke with Dylan Utly regarding the new pin welding procedures. Informed Dan Patterson to reference the completed fall protection work plan when completing his ptp for work needing to leave the Mewp basket |
Inspector Signature: | |
Date: | 04/30/2024 |